Jeff Davis Electric Coop will have a scheduled outage on Thursday, September 3, 2026. This outage is required to remove connections from the 69kV transmission line and connect equipment in the Manchester Substation and Hackett Substation to the 230kV transmission line.
Outages
Here is my brief description.