Availability
Available to Members of the Cooperative for service farm rice dryers.
Type of Service
Alternating current, 60 Hertz, single or three-phase at available secondary voltage. Protection of three-phase motors on all phases against single-phasing shall be the responsibility of the Member. The Member shall also be responsible for providing adequate overcurrent protection on each phase of all motors.
Monthly Rate
- Service Charge: $28 per bill
- Energy Charge: 10.730 cents per kWh
Power Cost Adjustment
The above charges shall be increased as determined under Power Cost Adjustment Clause PCA-JD.
Terms of Payment
The above rates are net and due within 20 days from the mailing date. After that date, the gross rate due will be 5% higher than the net amount. If not paid within 30 days, service will be disconnected and a $15 reconnect charge will be applicable before service can be reconnected.